FG, LASG okay 24-hr Electronic Call-Up System suspension at NPA
| A 24-hour suspension of the Electronic Call-up System ( Eto) used by the Nigerian Port Authority (NPA to call trucks for loading at the ports, starting from Sunday has been endorsed.
The suspension was to enable NPA clear the backlog of trucks that could not load due to the current strike action by ports workers under the aegis Maritime Workers Union of Nigeria (MWUN). This decision was the hallmark of the on-the-spot assessment of the current gridlock at Apapa port by a team made up of representatives of NPA, Lagos Task Force on Apapa Gridlock, and Apapa ports stakeholders The Team noted that the road construction sites were contributing to the current gridlock at Apapa. Areas visited by the team included the ongoing road construction projects at Liverpool Road under-bridge, Tin Can Port 2nd gate, and Sunrise Bus Stop area on Apapa-Mile 2 Expressway. The Team has mandated the NPA to make a public statement to reassure stakeholders that Electronic Call-up System ( Eto) is working and no backlog of trucks created by the picketing of APMT by Maritime Workers Union of Nigeria (MWUN), It has recommended that the Eto system be immediately shut down temporarily for 24 hours and new bookings and the merging of tickets will be put on hold. As part of the strategy to decentralize traffic and ensure seamless flow of traffic in the Apapa area as well as TinCan – Mile 2 axis, the team identified the urgent need to open up Tin Can – Mile 2 corridor. In this regard, the Enforcement Team of LASG and NPA were to immediately deploy personnel and logistics to create a corridor for Tin Can bound trucks from Sunday 18th 04 2021. By the Team’s recommendation, all Tin Can Island Port bound container laden trucks would be stopped from passing along Apapa corridor and follow Tin Can – Mile 2 corridor and all export bound trucks to Apapa Port (LPC) must predate at Lilypond Truck Transit Park (LTTP). It stated that to enhance enforcement capability, security personnel will be deployed to reinforce access points such as Ijora Olopa, Ijora SIFAX and Sunrise for better control. An Operation’s meeting with all holding bays and satellite parks operators has been scheduled for Wednesday, April 21 for an update on the directives to decongest the port. |




